Challenge

The project requirement

The relocation required equipment and associated cabling to be identified, removed, packaged and transported from Medallion to OADC within a coordinated physical work scope.

Ideal Solutions Response

Scope of work delivered

1

Identified and labelled equipment and cables.

2

Deinstalled and decommissioned data-centre equipment.

3

Packaged equipment and prepared it for transportation.

4

Carried out loading, transportation from Medallion to OADC, and offloading.

5

Provided goods-in-transit logistics support.

Result

Project delivery summary

The project covered the coordinated removal, packaging and relocation of data-centre equipment and associated cabling. The documented scope concerns physical equipment relocation, rather than application or data migration.

Related Capabilities

The service areas behind this outcome

These service areas show the practical delivery capabilities behind the project outcome.

More Proof

Related case studies

View all
AI-generated illustration of office networking, CCTV and access-control infrastructureAI-generated illustration

WIOCC Nigeria Limited

WIOCC Second-Floor Office Network, Security and Safety Systems

Ideal Solutions delivered LAN, Wi-Fi, CCTV, access control and safety systems for WIOCC Nigeria Limited's second-floor office setup.

Telecommunications
View Case Study
AI-generated illustration of a data-centre entrance with access-control and emergency-release hardwareAI-generated illustration

Open Access Data Centres (OADC)

Paxton Access Control Installation for Open Access Data Centres

Ideal Solutions installed an access control system for OADC, including Paxton Net2 controllers, readers, electromagnetic locks and supporting cabling.

Data Centres
View Case Study

Next Step

Need this kind of result in your own environment?

Share the site, system, or operational challenge and Ideal Solutions can shape the right assessment, rollout, and support plan.

Book consultation